Flower Market, London
During a major renovation of one of London's largest wholesale markets, Scandia was contracted to construct a series of high-capacity cold rooms alongside bespoke office pods to serve the varied needs of the flower market's tenants.Type of Cold Room: Multiple Cold Rooms & Office Pods
A large-scale, multi-unit installation consisting of several chilled storage units and custom-built, DDA-compliant office pods constructed using 80mm PIR panels.
Specifications
Cold Rooms:
Dimensions: 3 x units measuring 4160mm x 3160mm x 2580mm
Doors: 1300mm x 2050mm high sliding doors with Fermod 2000 series tracks and aluminium clad frames.
Protection: Aluminium top-hat panel protection applied to the surrounding faces.
Office Pods:
Dimensions: 6 x units measuring 3160mm x 2160mm x 2480mm (plus 1 x larger pod at 4.2m x 3.2m x 2.5m).
Doors: 1000mm x 2000mm high personnel doors with mortice latches and vision panels following DDA guidelines.
Protection: Aluminium top-hat panel protection applied to the surrounding faces.
Interior Finishes: Safetred spectrum tiling on the internal floors, and anthracite grey worktop benching installed on the internal faces.
Client Requirement
In one of London’s largest wholesale markets lies the flower market. Having undergone a huge renovation and rebuild, a number of cold rooms and specialised office pods were required within the unit to successfully suit the specific, day-to-day needs of the market tenants.
Our Solution
Scandia attended the site alongside refrigeration companies, building planners, and other tradesmen to discuss the desired project outcome, specifications, and project timelines.
Using 80mm PIR panels, Scandia efficiently constructed three 4.2m x 3.2m x 2.5m high cold rooms, six 3.2m x 2.2m x 2.5m high office pods, and one 4.2m x 3.2m x 2.5m high office pod alongside other cold room works we were contracted to undertake. Despite strict project timelines due to an ever-looming opening date, all works were closely adhered to and remarkably finished earlier than the contractors’ targeted completion dates.